Revision as of 17:05, 16 March 2023 by DrKazza (talk | contribs) (Created page with "The Recovery of a Credit Event is used in two main situations, Pricing and Settlement. == Recovery Assumption - Pricing == When pricing Credit Derivatives it is almost impossible to escape the Recovery Assumption when building a pricing model. The discounting models will have a discount factor linked to the probability of survival, that is obviously one of the major unknowns in the market however given the price of a bond (or a credit derivative) one can work out the m...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

The Recovery of a Credit Event is used in two main situations, Pricing and Settlement.

Recovery Assumption - Pricing

When pricing Credit Derivatives it is almost impossible to escape the Recovery Assumption when building a pricing model.

The discounting models will have a discount factor linked to the probability of survival, that is obviously one of the major unknowns in the market however given the price of a bond (or a credit derivative) one can work out the market price implied survival probability, however this cannot be done without making some kind of guess as to the price of an asset after a default has occurred.

An example of how this relationship behaves can be illustrated as follows:

Imaging a distressed zero coupon bond which is trading at a price of 80 and has a month to maturity - i.e. no cashflows are due other than the principal payment and there's little effect of the time value of money.

If you assume that the recovery of this bond would be 0 then there's a long way for this bond to fall before it would default.

  • If the bond survives you would make 20 as it would redeem at par (100)
  • If the bond defaults you would lose 80

Using a fair/efficient market assumption the probability of survival Ps satisfies this equation:

20 * Ps = 80 * (1 - Ps)

This would imply an 80% chance of survival (or 20% probability of default).


Now let's say that actually the entity issuing this bond has a lot of assets that would be sold in a default and actually the bond wouldn't go to zero but would in fact trade more like 50, this is much closer to the current price and therefore the probability of survival is a lot lower:

  • If the bond survives you would make 20 as it would redeem at par (100)
  • If the bond defaults you would lose 30

Using a fair/efficient market assumption the probability of survival Ps satisfies this equation:

20 * Ps = 30 * (1 - Ps)

Now this implies a 60% probability of survival (or 40% probability of default).


The Recovery Assumption is used in pricing of credit derivatives and is only relevant before the Auction process has happened


TO DO - ADD IN STUFF ABOUT AGREEMENT OF RECOVERY ASSUMPTIONS

Final Price - post-Auction Recovery for Settlement

Once a Credit Event has been officially determined an Auction Process begins, originally designed to be Physical Settlement, now Credit Default Swaps almost always trade with Cash Settlement. That amount is calculated as the Notional of the trade multiplied by (100 - Final Price)%


TO DO - ADD IN BIG BANG STUFF